Our latest projects

2014 - 2015 Barangaroo - Horiso has recently been commissioned to supply Climate Ready Control Systems for facade shading on the Barangaroo project.
2014 - 161 Castlereagh Street - Horiso completed the manufacturing of the Specialty Venetian Blinds and installation and commissioning of the control system at 161 Castlereagh Street Sydney.
Download case study

2013 - 8 Chifely Square - Horiso completed the electrical, control and commissioning of the facade shading systems at 8 Chifley Square.
Download case study

2014 - Valentine Sports Park - Horiso manufactured 11 Specialty Venetian blinds for the new administration, amenities and stadium building for Football NSW at Glendale.
Download case sudy

Other recent projects

2014 - University of Queensland - Advanced Engineering Building
2014 - University of Queensland - Learning Innovation Building
2013 - Newington College AJ Rae and LRD Pyke Centres. Download case study
2012 - 1 Bligh Street Sydney, opening 2011 - see videosDownload case study
2011 - Darling Quarter Sydney. Download case study
2011 - Macquarie University C3C Library. Download case study
2010 - Christchurch Civic Centre. Download case study

Engineering Division new project involvement

Neil Krotzsch and his team at Horiso have been designing, developing and producing an advanced range of Climate Ready® Control Systems for commercial and residential applications.
These are advanced systems that not only respond to climatic conditions, they also enable preferential user control for increased comfort levels. Their WiFi ZigBee PRO control system - the EZ1, EZ2 and EZ4 are installed with significantly less electrical components than other system and has finger tip control via Horiso's Smart Remote App for iPhone, iPAD and tablets, utilising standard WiFi / internet connectivity. Read more - horiso engineering division